A post and rail fence is a practical way to form a boundary around paddocks, fields, driveways and larger gardens. The installation method depends on the system you choose, so confirm the section length, post type and rail configuration before marking the fence line. Start by comparing all post and rail fencing kits, including the treated softwood kit and the chestnut kit.
Choose the right post and rail system
Do not use one standard post spacing for every post and rail fence. BB&B’s two systems use different section lengths and components:
- Treated softwood post and rail kit: each section covers 1.8m (6ft) and is 1.2m (4ft) high. A section includes one treated 4×4 timber post, three treated 4×2 rails, fast-setting concrete and the necessary screws and fixings. The rails are fixed to the face of the posts.
- Chestnut post and rail kit: each section covers 2.7m (9ft) and is 1.2m (4ft) high. Choose chestnut or square treated timber posts with two or three cleft chestnut rails. A selected section includes the relevant post, rails and fast-setting concrete.
Use the measurements and components shown on the product page for the kit you are ordering. Do not assume that an 8ft spacing, fence brackets, post caps or identical fittings apply to both systems.
Tools and preparation
The exact tools will depend on the selected kit and ground conditions. A typical installation may require:
- Tape measure, stakes and a string line.
- Spade or suitable post-hole digging equipment.
- Spirit level and a temporary way to brace posts.
- Drill or driver and suitable bits for the treated softwood system.
- Tools for preparing and placing the supplied fast-setting concrete.
- Suitable gloves, eye protection and other task-specific protective equipment.
Posts and rails are heavy and awkward to handle. If you are not experienced with groundworks, power tools or setting structural timber, use the BB&B installation service or ask an experienced installer to complete the work.
Step 1: Measure the fence line
Measure each straight boundary run separately and note corners, changes in direction, slopes and any planned openings. Use the garden measuring guide if you need help working out the total run length. For an irregular layout or measurements you cannot confirm yourself, see the garden site survey service.
Enter the total boundary length in the relevant product configurator. It will calculate the sections required using the correct 1.8m or 2.7m system rather than a generic spacing.
Step 2: Check the route before digging
- Confirm that the proposed line is within the correct boundary.
- Check access for materials, spoil and installation equipment.
- Identify slopes, soft ground, tree roots and other obstructions that could affect the line.
- Locate underground services before breaking ground. If their position is uncertain, stop and obtain appropriate information or professional assistance.
- Check any current planning, boundary or land-use requirements that apply to the property and project.
Step 3: Mark and plan the sections
Mark the start and end of each straight run with stakes and pull a string line between them. Plan the actual sections from the selected kit, including end posts, corners and any openings. Avoid marking all post holes from an assumed universal spacing.
Where the boundary changes direction or level, confirm how the rails will meet before digging. Chestnut rails can follow gentle curves and changes in ground level, but the layout still needs to match the selected post and rail configuration.
Step 4: Set the first and end posts
Dig the first post hole to suit the supplied post, ground conditions and intended finished height. Read the fence post-hole guide for preparation and digging guidance. Position the post against the string line, check it is plumb in both directions and brace it so it cannot move while the concrete is placed.
Set the end post for the same straight run and keep both posts aligned. Follow the instructions for the supplied fast-setting concrete and allow it to secure the posts before placing loads on the fence.
Step 5: Set the intermediate posts
Work from the actual section length of the chosen kit. Check every post against the string line and spirit level as you proceed. Recheck the distance to the next post before setting it—small spacing errors can accumulate and prevent the final rails from fitting correctly.
On sloping ground, decide whether the rails will follow the slope or be stepped before the posts are permanently fixed. Keep the finished rail positions consistent along each run.
Step 6: Fit the rails for your selected kit
Treated softwood kit
Position the three treated rails on the face of the posts and secure them using the supplied screws and fixings. Check each rail is level or follows the planned slope before fully tightening the fixings.
Chestnut kit
Fit the two or three cleft chestnut rails into the selected post system as shown by the product configuration. Keep the natural orientation of the rails consistent and make sure each connection is fully seated before continuing along the run.
Step 7: Inspect and finish the fence
- Check every post is secure and the completed line is consistent.
- Check that rails and supplied fixings are correctly seated and secure.
- Remove temporary braces only when the posts are stable.
- Clear surplus materials and dispose of waste appropriately.
- Recheck the fence after the concrete has set and before it is placed under normal use.
Common post and rail installation mistakes
- Using a generic spacing instead of the selected kit’s section length.
- Failing to measure straight runs, corners and openings separately.
- Setting several posts before checking that the rails will fit.
- Ignoring slopes, soft ground or underground services.
- Mixing treated softwood and chestnut installation methods or components.
Supply only or professional installation
Both post and rail kits can be configured for supply only or installation where available. Compare the treated softwood fencing kit with the chestnut fencing kit, or return to the post and rail category to choose the right system.
If you are unsure about measurements, access, ground conditions or the selected configuration, contact the team before ordering.
